Skip to main content

Expert glazing. Honest partnership. Built right the first time.

Why USGA

The people, coordination, and standards behind the finished work. Here’s what choosing USGA means for your project.

The people behind your project

Experience you can work with.
People you can talk to.

Glazing decisions rarely happen in isolation. USGA brings estimating, project management, engineering and drafting, the shop, and the field into the same conversation.

45+ years in the trade. Kevin Youngblood’s hands-on experience informs the difficult decisions a project can raise.

Founded in 2007. USGA has grown through completed work, reputation, and relationships.

Meet the people behind the work

One team, from the office to the field.

  • Experience at every stage

    Trade knowledge connects early planning, system coordination, fabrication, and field installation.

  • Honest, direct communication

    Straight answers and a realistic assessment of what the project needs, without sales pressure.

  • Solutions for complex work

    Unusual conditions and difficult installations get the attention and coordination they require.

  • Accountability through installation

    Office, shop, and field stay connected. Correct, lasting work is the expectation at every handoff.

How the work comes together

From the first estimate
to the final installation.

A connected team matters most in the handoffs. Each stage carries the project’s requirements forward.

  1. 01

    Estimating

    Review scope, quantities, and the systems the project calls for.

  2. 02

    Project management

    Coordinate schedules, submittals, and project communication.

  3. 03

    Engineering & drafting

    Work through dimensions, interfaces, and installation details.

  4. 04

    Shop

    Bring coordinated details into fabrication and preparation.

  5. 05

    Field installation

    Carry that preparation through to the installed work.

When conditions change, the conversation continues across the team rather than stopping at a departmental handoff.

Proven in the details

125-foot NanaWall folding glass wall dividing the concourse from the gymnasium at USF War Memorial Gymnasium
USF War Memorial GymnasiumNanaWall folding glass wall system

Complex systems.
Carefully coordinated work.

A finished glass wall brings together framing, hardware, alignment, and operation. Familiarity with the specified system helps the team work through those details before they reach the field.

The application
An interior operable glass wall
The coordination
Framing, connections, and operable panels
The evidence
Completed USGA project photography

The standard behind the work

“If you can’t do it correctly, don’t do it at all.”

Kevin YoungbloodPresident

Certified & Trusted

Experience is backed by credentials you can review.

Warranty coverage varies by system and project scope. Ask your project manager for the specific terms that apply to your work.

Detail of USGA Inc. curtain wall glazing, Grand Hyatt San Francisco
Contact Our Team